| Finalization and appropriation of the US FY27 defense budget, particularly given the ongoing continuing resolution, which will directly determine funding levels for unmanned undersea vehicles (UUVs) and related programs. | Q4 2026 - Q2 2027 | 2026-10-01 | 2027-06-30 | The finalization of the US FY27 defense budget will directly determine the financial resources available for UUV development, procurement, and deployment across the defense sector, impacting all constituent tickers involved in government contracts. Delays due to the continuing resolution can halt new programs and create bottlenecks. | Theme | theme_composer | OII, ESLT, TDY, BA, HII, LHX, NOC | 7 | 0.0104 | 1.18 | 0.92 | Regulatory/Policy | 1.35 | 1.522 | 2026-11-03 | False | 1 | 1.2796 | 187.5362 | theme_composer | Theme composer | | |
| Publication of results and key takeaways from the NATO REPMUS (Robotics and Autonomous Systems in Maritime Operations) 2026 exercise, which concluded on September 25, 2026. | Late October - November 2026 | 2026-10-25 | 2026-11-30 | REPMUS is a critical NATO exercise for testing and evaluating unmanned maritime systems in realistic scenarios. Positive outcomes, particularly regarding UUV effectiveness in anti-submarine warfare or mine countermeasures, could accelerate NATO member procurement and standardization, benefiting a wide range of theme constituents. | Theme | theme_composer | OII, ESLT, TDY, HII, LHX, KOG.OL | 6 | 0.0047 | 1.18 | 1.0 | Conference/Council | 1.2 | 0.6631 | 2026-11-03 | False | 1 | 1.0385 | 147.0468 | theme_composer | Theme composer | | |
| Announcements regarding further progress, successful deployments, or procurement milestones for large-scale unmanned undersea vehicle (XLUUV) programs, including the U.S. Navy's Orca, DARPA's Manta Ray, and Australia's Ghost Shark, especially following recent funding for Ghost Shark. | Ongoing, Q4 2026 - Q2 2027 | 2026-10-01 | 2027-06-30 | These programs are at the forefront of UUV technology. Any substantial progress, successful deployments, or resolution of delays would validate the capabilities of advanced XLUUVs, potentially accelerating broader adoption and signaling market readiness for next-generation subsea assets, impacting prime contractors and their supply chains. Australia's recent $5.8B commitment to undersea autonomy, including $1.7B for more Ghost Sharks, underscores this importance. | Theme | theme_composer | BA, HII, TDY, OII, NOC, PNG.V, KOG.OL | 7 | 0.0076 | 1.18 | 0.92 | | 1.0 | 0.8282 | 2026-11-03 | False | 1 | 1.2675 | 137.5987 | theme_composer | Theme composer | | |
| Announcement of further concrete developments, initial deliveries, and additional significant international contracts for subsea drones, UUVs, or related subsea defense systems from non-US allied nations, including the AUKUS alliance's joint UUV program. | Ongoing, Q4 2026 - Q1 2027 | 2026-10-01 | 2027-03-31 | Geopolitical tensions and the demonstrated effectiveness of UUVs are driving global demand. Large international awards, such as those expected from the AUKUS Pillar II UUV program (with first deliveries in 2027), directly boost revenue and backlog for theme constituents, indicating strong market expansion beyond domestic defense spending and validating the global adoption of subsea autonomy. | Theme | theme_composer | ESLT, OII, LHX, TDY, PNG.V, SAAB-B.ST, HII | 7 | 9.1035 | 1.18 | 0.92 | | 1.0 | 988.2756 | 2026-11-03 | False | 1 | 1.2392 | 134.5288 | theme_composer | Theme composer | | |
| Ongoing compliance and funding initiatives stemming from the EU Critical Entities Resilience (CER) Directive, following the July 2026 deadline for member states to identify critical entities. | Ongoing, Q4 2026 - Q2 2027 | 2026-10-01 | 2027-05-31 | The CER Directive mandates enhanced resilience for critical infrastructure, including undersea assets. With member states having identified critical entities by July 2026, the subsequent 10-month compliance period (ending May 2027) will accelerate investment in defensive UUV technologies, surveillance, and related services, benefiting companies involved in critical infrastructure protection. | Theme | theme_composer | OII, TDY, ESLT, KOG.OL | 4 | 0.0027 | 1.18 | 0.92 | | 1.0 | 0.2931 | 2026-11-03 | False | 1 | 0.6239 | 67.7289 | theme_composer | Theme composer | | |
| Contract finalization for the Netherlands to acquire one GlobalEye system, to be operated in conjunction with the Swedish Air Force. | shortly and during the year | 2026-10-01 | 2026-12-31 | This contract reinforces GlobalEye's market traction and adds to Saab's backlog, demonstrating continued demand for advanced surveillance systems and potentially paving the way for further orders. | Ticker | | | | | | | | | | | | | | | earnings_transcript | SAAB-B.ST (ticker) | SAAB-B.ST_29d8a259 | 2026-10-23 |
| Pricing of the follow-on tanker contracts for the US Air Force, for which Boeing is the sole source. | pricing that in the fall time frame according to the current schedule | 2026-09-01 | 2026-11-30 | This is an opportunity for Boeing to secure a new contract with improved margins and risk-sharing, moving away from the loss-making existing contract. Favorable pricing is bullish for BDS profitability. | Ticker | | | | | | | | | | | | | | | earnings_transcript | BA (ticker) | BA_611b0b0c | 2026-01-27 |
| The new 737 North Line in Everett begins initial operations at a low rate of production. | later this year at a low rate of initial production | 2026-07-01 | 2026-12-31 | This new production line is essential for enabling future 737 rate ramps above 47 per month to 52 per month, crucial for meeting demand and improving long-term financial performance. | Ticker | | | | | | | | | | | | | | | earnings_transcript | BA (ticker) | BA_b7790899 | 2026-04-22 |
| Activation and staffing of the new North Line in Everett to support 737 MAX production rates above 47 airplanes per month. | For production above 47, we'll add our new North Line in Everett | 2026-10-01 | 2027-12-31 | This facility expansion is essential for meeting future demand and further increasing production, directly impacting long-term revenue and profitability. Successful ramp-up is bullish, delays are bearish. | Ticker | | | | | | | | | | | | | | | earnings_transcript | BA (ticker) | BA_2785c04e | 2026-01-27 |
| FAA certification of the 737-7 and 737-10, including approval of the final design changes for the engine anti-ice issues. | still anticipate certification for both the 737-7 and 737-10 in 2026 | 2026-01-01 | 2026-12-31 | Certification is essential for beginning deliveries of these models, unlocking significant revenue and cash flow, and reducing inventory drag. Delays would be bearish, while on-time certification is bullish. | Ticker | | | | | | | | | | | | | | | earnings_transcript | BA (ticker) | BA_2ef67317 | 2026-01-27 |
| Boeing's planned increase of 737 MAX production rate from 42 to 47 airplanes per month, following an FAA rate review and monitoring factory health. | later this year | 2026-07-01 | 2026-12-31 | This rate increase is critical for boosting commercial deliveries and improving cash flow. Successful execution is bullish, while delays or quality issues would be bearish. | Ticker | | | | | | | | | | | | | | | earnings_transcript | BA (ticker) | BA_076bd55b | 2026-01-27 |
| GE finalizing the modification for the 777X engine durability issue and Boeing incorporating it into the certification plan. | remain on track for schedule of first delivery in 2027 | 2026-04-24 | 2027-12-31 | Resolution is essential for the 777X certification and maintaining the 2027 first delivery target, which is crucial for the program's financial performance and investor confidence. | Ticker | | | | | | | | | | | | | | | earnings_transcript | BA (ticker) | BA_ebc832c1 | 2026-04-22 |
| Expected payment to the Department of Justice. | second half of the year | 2026-07-01 | 2026-12-31 | This payment is assumed in the free cash flow outlook and will directly impact the company's cash position in the second half of the year. | Ticker | | | | | | | | | | | | | | | earnings_transcript | BA (ticker) | BA_28751fcf | 2026-04-22 |
| Boeing increasing the 787 production rate to 10 airplanes per month. | later this year | 2026-07-01 | 2026-12-31 | This rate increase is a key operational milestone, directly impacting delivery volume, revenue growth, and free cash flow for the Commercial Airplanes segment. | Ticker | | | | | | | | | | | | | | | earnings_transcript | BA (ticker) | BA_a200f89a | 2026-04-22 |
| Resolution of premium seat certification delays impacting 787 deliveries. | Implicitly 'later this year' to meet full year delivery goals of 90-100 airplanes. | 2026-04-24 | 2026-12-31 | Unlocks deliveries of already built 787s, directly impacting commercial airplane revenue and cash flow, and is necessary to meet the full-year delivery target. | Ticker | | | | | | | | | | | | | | | earnings_transcript | BA (ticker) | BA_a4bec4e3 | 2026-04-22 |
| Receipt of 'many more orders' in Israel for ground high-power lasers following the IRON BEAM deployment. | next year, we'll see many more orders here in Israel for ground high-power lasers. | 2026-01-01 | 2026-12-31 | Significant follow-on orders would confirm market acceptance and revenue potential for Elbit's directed energy solutions, impacting future revenue and backlog. | Ticker | | | | | | | | | | | | | | | earnings_transcript | ESLT (ticker) | ESLT_a6aff2ab | 2025-11-18 |
| Elbit Systems expects to begin delivering equipment from its expanded Ramat Beka facility in Israel. | this year, we believe that we will start delivering equipment from the Ramat Beka facility. Actually, it should happen quite soon. | 2026-04-01 | 2026-12-31 | This event is crucial for addressing growing global capacity constraints and meeting elevated demand, potentially enabling higher revenue generation and backlog conversion. | Ticker | | | | | | | | | | | | | | | earnings_transcript | ESLT (ticker) | ESLT_208db52c | 2026-03-17 |
| Germany is expected to finalize a major procurement framework agreement for up to 500 EuroPULS rocket artillery systems, with contractual arrangements and initial deliveries determined during a parliamentary window. | The parliamentary window expected in the second half of 2026 will determine the contractual arrangements and initial deliveries. | 2026-07-01 | 2027-03-20 | This substantial contract, potentially worth €6 billion, would establish Germany as a key EuroPULS production hub and significantly boost Elbit's revenue and market share in Europe. | Ticker | | | | | | | | | | | | | | | earnings_transcript | ESLT (ticker) | ESLT_a7a918ed | 2026-03-17 |
| Recognition of the $5.1 billion CVN-75 USS Harry S. Truman Refueling and Complex Overhaul (RCOH) contract. | fourth quarter results | 2026-10-01 | 2026-12-31 | This significant contract award will be recognized in Q4, boosting reported revenue and backlog, and reflecting strong operational execution. | Ticker | | | | | | | | | | | | | | | earnings_transcript | HII (ticker) | HII_889cbe90 | 2026-10-29 |
| Delivery of the SSN-800 Arkansas, the last Block IV Virginia-class submarine. | later this year | 2026-10-01 | 2026-12-31 | Timely delivery demonstrates execution on critical submarine programs, contributes to revenue recognition, and is a positive indicator for future production cadence. | Ticker | | | | | | | | | | | | | | | earnings_transcript | HII (ticker) | HII_5e7b02c2 | 2026-10-29 |
| Delivery of the LPD 30 Harrisburg amphibious assault ship, following trials in Q3. | delivery towards the end of the year | 2026-10-01 | 2026-12-31 | This represents a significant revenue event for Ingalls Shipbuilding and demonstrates successful execution on amphibious programs. | Ticker | | | | | | | | | | | | | | | earnings_transcript | HII (ticker) | HII_05a52c09 | 2026-07-30 |
| Delivery of the LPD 30 Harrisburg amphibious transport dock. | this year | 2026-10-01 | 2026-12-31 | The delivery of LPD 30 Harrisburg is a key milestone for Ingalls Shipbuilding, demonstrating execution and contributing to revenue for the year. | Ticker | | | | | | | | | | | | | | | earnings_transcript | HII (ticker) | HII_c4c002a9 | 2026-10-29 |
| Preliminary acceptance of the CVN 79 Kennedy aircraft carrier. | later this year | 2026-10-01 | 2026-12-31 | This is a significant step towards final ship delivery in 2027, impacting revenue recognition and demonstrating progress on a flagship program. | Ticker | | | | | | | | | | | | | | | earnings_transcript | HII (ticker) | HII_3794a1c6 | 2026-07-30 |
| Delivery of the SSN-800 Arkansas submarine. | later this year | 2026-10-01 | 2026-12-31 | This is a major revenue event and demonstrates HII's execution on critical nuclear submarine programs, impacting shipbuilding segment performance. | Ticker | | | | | | | | | | | | | | | earnings_transcript | HII (ticker) | HII_896a9465 | 2026-07-30 |
| Agreement on US defense appropriations for the current fiscal year (FY27), resolving the continuing resolution. | in the coming months | 2026-11-01 | 2026-12-11 | Finalization of the defense budget provides crucial clarity and stability for program funding, directly impacting the timing and rate of contract awards and execution for defense contractors like Northrop Grumman. | Theme | | | | | | | | | | | | | | | earnings_transcript | NOC (ticker) | NOC_a675e267 | 2026-10-20 |
| Deployment of nearly 50 Tranche 1 transport layer satellites for the Space Development Agency's proliferated warfighter space architecture. | In the next 6 months | 2026-11-01 | 2027-04-30 | This milestone demonstrates successful execution on a critical space development program, providing unparalleled space-based communication for the US Space Force and contributing to Northrop Grumman's durable sales and leadership in national security space. | Ticker | | | | | | | | | | | | | | | earnings_transcript | NOC (ticker) | NOC_8ceababf | 2026-10-20 |
| Improving geographic mix and higher ROV fleet utilization in the Subsea Robotics (SSR) segment. | second half of 2026 | 2026-07-01 | 2026-12-31 | This is expected to drive a rebound in SSR EBITDA margins, which are crucial for the company's overall profitability and achieving full-year guidance. | Ticker | | | | | | | | | | | | | | | earnings_transcript | OII (ticker) | OII_60c66093 | 2026-04-22 |
| Industry-wide deepwater FIDs and subsea tree awards forecast for 2026 (42 deepwater FIDs, ~300 subsea tree awards, ~370 installations per Rystad Energy). | in 2026, per industry forecasts cited by management | 2026-01-01 | 2026-12-31 | If realized, would drive offshore activity, demand for Oceaneering's SSR/ROV equipment and IMDS solutions, potentially expanding backlog and revenue; macro tailwinds. | Theme | | | | | | | | | | | | | | | earnings_transcript | OII (ticker) | OII_b6863e64 | 2026-02-18 |
| Deployment of the newest electric work class ROV momentum on vessel support operations in the U.S. Gulf. | later this year | 2026-07-01 | 2026-12-31 | Indicates expanded deployment of electric ROV technology, potentially boosting utilization, efficiency, and revenue in 2026 and beyond. | Ticker | | | | | | | | | | | | | | | earnings_transcript | OII (ticker) | OII_ec5c4719 | 2026-02-18 |
| Resolution or continued evolution of the Middle East conflict and its direct impact on Integrity Management and Digital Solutions (IMDS) activity in the region. | Middle East activity remains uncertain and will depend on how regional conditions evolve | 2026-04-22 | 2026-12-31 | A positive resolution could lead to a surge in inspection work for facilities, boosting IMDS revenue, while prolonged conflict would continue to depress activity. | Theme | | | | | | | | | | | | | | | earnings_transcript | OII (ticker) | OII_d2e68df3 | 2026-04-22 |
| Oceaneering identifying and potentially pursuing attractive inorganic growth opportunities (M&A), particularly those complementing ADTech. | as those things become more attractive | 2026-04-22 | 2028-04-22 | Strategic acquisitions could enhance Oceaneering's technological capabilities, market reach, and diversify its revenue streams, contributing to long-term value creation. | Ticker | | | | | | | | | | | | | | | earnings_transcript | OII (ticker) | OII_cc0b70e8 | 2026-04-22 |
| The market introduction of PCI Express Gen 6 CPUs and GPUs, leading to a rebound in Teledyne's protocol analyzer sales within the Instrumentation segment. | second half of the year | 2026-07-01 | 2026-12-31 | This would drive sales growth in the higher-margin test and measurement business, contributing to the expected full-year growth and margin improvement in the Instrumentation segment. | Ticker | | | | | | | | | | | | | | | earnings_transcript | TDY (ticker) | TDY_3be47bd9 | 2026-04-22 |
| Sweden's first GlobalEye Airborne Early Warning & Control (AEW&C) system becomes operational. | early 2027 | 2027-01-01 | 2027-03-31 | The operational deployment of the first Swedish GlobalEye demonstrates successful delivery and integration of a key product, potentially boosting confidence for other GlobalEye customers like Canada and NATO. | Ticker | | | | | | | | | | | | | | | earnings_transcript | SAAB-B.ST (ticker) | SAAB-B.ST_9d8b19e6 | 2026-10-23 |
| Inauguration of the new Dynamics manufacturing facility in India. | early next year | 2027-01-01 | 2027-03-31 | This facility, expected early next year, will further enhance Saab's global production capacity for Dynamics products, supporting long-term growth and meeting increasing international demand. | Ticker | | | | | | | | | | | | | | | earnings_transcript | SAAB-B.ST (ticker) | SAAB-B.ST_05f8d5d4 | 2026-07-17 |
| Saab's new Carl-Gustaf manufacturing facility in India commencing significant production and contributing to results. | coming into play next year (2027) | 2027-01-01 | 2027-12-31 | Expands production capacity to meet strong market demand for Dynamics' portfolio, supporting future revenue growth and strengthening Saab's 'Make in India' commitment. | Ticker | | | | | | | | | | | | | | | earnings_transcript | SAAB-B.ST (ticker) | SAAB-B.ST_e170dd82 | 2026-02-05 |
| Deliveries of approximately 30 pre-built 737-7 and 737-10 aircraft are expected to commence. | early next year | 2027-01-01 | 2027-03-31 | This will convert inventory into revenue and cash flow, demonstrating progress in regulatory approvals and commercializing new MAX variants. | Ticker | | | | | | | | | | | | | | | earnings_transcript | BA (ticker) | BA_32c3f9a1 | 2026-10-27 |
| Deliveries of the LHA-8 Bougainville amphibious assault ship and the DDG 129 Jeremiah Denton destroyer. | at the beginning of next year | 2027-01-01 | 2027-03-31 | These deliveries are significant milestones for Ingalls Shipbuilding, indicating progress on major programs and contributing to future revenue and operational performance. | Ticker | | | | | | | | | | | | | | | earnings_transcript | HII (ticker) | HII_14d7c124 | 2026-10-29 |
| Award of the frigate contract. | in Q1 | 2027-01-01 | 2027-03-31 | Securing this contract is crucial for the frigate program, providing future revenue and workload for Ingalls Shipbuilding and supporting the Navy's modernization efforts. | Ticker | | | | | | | | | | | | | | | earnings_transcript | HII (ticker) | HII_6e3818b4 | 2026-10-29 |
| The 777X program is assumed to achieve FAA certification for financial planning purposes. | by midyear 27 | 2027-04-01 | 2027-06-30 | Certification is a critical de-risking event for the 777X program, enabling first deliveries and contributing to future positive cash flow from the program. | Ticker | | | | | | | | | | | | | | | earnings_transcript | BA (ticker) | BA_7fe637ed | 2026-10-27 |
| Saab's portion of the T-7 Red Hawk trainer program reaching profitability, driven by increased deliveries and potential contract renegotiations. | a couple of years more (from Feb 2026), looking at '28, '29 actually. | 2028-01-01 | 2029-12-31 | Improved profitability in the Aeronautics segment by reducing under-absorption in the West Lafayette facility and potentially securing additional contract value. | Ticker | | | | | | | | | | | | | | | earnings_transcript | SAAB-B.ST (ticker) | SAAB-B.ST_a1bffaf2 | 2026-02-05 |