| SAAB-B.ST_29d8a259 | shortly and during the year | 2026-10-01 | 2026-12-31 | Contract finalization for the Netherlands to acquire one GlobalEye system, to be operated in conjunction with the Swedish Air Force. | This contract reinforces GlobalEye's market traction and adds to Saab's backlog, demonstrating continued demand for advanced surveillance systems and potentially paving the way for further orders. | Ticker | 2026-10-23 | earnings_transcript | SAAB-B.ST (ticker) |
| AVAV_f9170f2e | over the next quarter or so | 2026-09-10 | 2026-12-10 | Finalization of the U.S. Congress's approval of the fiscal year 2027 defense budget. | This macro catalyst will remove uncertainty, potentially accelerating customer funding and program awards for AeroVironment and the broader defense sector. | Theme | 2026-09-09 | earnings_transcript | AVAV (ticker) |
| AVAV_d830f143 | delayed given the election cycle | 2026-11-01 | 2027-05-31 | Passage of the US Congressional reconciliation bill with billions of dollars for defense categories relevant to AeroVironment. | This bill could provide significant additional funding for AVAV's products, positively impacting revenue and profitability. Delays or failure to pass would be bearish. | Theme | 2026-06-29 | earnings_transcript | AVAV (ticker) |
| DRO.AU_de1cb3fd | at the end of the year | 2026-10-01 | 2026-12-31 | Release of RFAI version 3, the next-generation AI engine, alongside new hardware. | This advanced AI engine is critical for maintaining technical superiority against evolving drone threats, enhancing product effectiveness, and supporting the company's high-margin SaaS strategy. | Ticker | 2026-02-24 | earnings_transcript | DRO.AU (ticker) |
| DRO.AU_68e37cfb | H2 2026 | 2026-07-01 | 2026-12-31 | Decision on the $750 million European 'Drone Wall' contract award. | A significant contract award would materially boost revenue and backlog, validating DroneShield's market position and growth trajectory. Failure to secure it or significant delays would negatively impact investor sentiment and future guidance. | Ticker | 2026-02-24 | earnings_transcript | DRO.AU (ticker) |
| DRO.AU_340b76fd | starting from this year | 2026-01-01 | 2026-12-31 | Significant business for DroneShield from the Australian LAND 156 program rollout. | This program represents a substantial domestic revenue opportunity, reinforcing DroneShield's position with the Australian Defence Force and contributing to overall revenue growth. | Ticker | 2026-02-24 | earnings_transcript | DRO.AU (ticker) |
| DRO.AU_b2f18f18 | towards the second half of the year and into '27 | 2026-07-01 | 2027-12-31 | Launch of the next generation of hardware across DroneShield's product family. | New hardware will offer enhanced capabilities, potentially at a higher price point, maintaining the company's competitive edge and driving future revenue growth. | Ticker | 2026-02-24 | earnings_transcript | DRO.AU (ticker) |
| DRO.AU_cc607be9 | in any 2026 quarter | 2026-03-31 | 2026-12-31 | SaaS revenue reaching >15% of total revenue mix in any 2026 quarter or achieving $25M+ annualized run rate by year-end. | Achieving these SaaS milestones is key for a valuation rerating, demonstrating the shift to a high-margin defense-tech firm with recurring revenue and smoother cash flows. | Ticker | 2026-02-24 | earnings_transcript | DRO.AU (ticker) |
| EOS.AU_53dfbebb | hopefully sign this year (2026) | 2026-08-12 | 2026-12-31 | Signing a contract with a government to develop a 300-kilowatt laser weapon family. | This would significantly advance EOS's laser weapon capabilities beyond 100kW, opening up new markets for C-RAM applications and extending space warfare capabilities to higher-flying objects. | Ticker | 2026-02-22 | earnings_transcript | EOS.AU (ticker) |
| EOS.AU_09b4e7b1 | in the course of this year, 2026 | 2026-08-12 | 2026-12-31 | Receipt of the next slice of orders for the M1E3 Abrams main battle tank integration. | This would be a crucial step in realizing the multi-billion dollar market potential for EOS's R400 Slinger weapon station on the Abrams tank, solidifying its position in the U.S. Army market. | Ticker | 2026-02-22 | earnings_transcript | EOS.AU (ticker) |
| ESLT_a6aff2ab | next year, we'll see many more orders here in Israel for ground high-power lasers. | 2026-01-01 | 2026-12-31 | Receipt of 'many more orders' in Israel for ground high-power lasers following the IRON BEAM deployment. | Significant follow-on orders would confirm market acceptance and revenue potential for Elbit's directed energy solutions, impacting future revenue and backlog. | Ticker | 2025-11-18 | earnings_transcript | ESLT (ticker) |
| ESLT_208db52c | this year, we believe that we will start delivering equipment from the Ramat Beka facility. Actually, it should happen quite soon. | 2026-04-01 | 2026-12-31 | Elbit Systems expects to begin delivering equipment from its expanded Ramat Beka facility in Israel. | This event is crucial for addressing growing global capacity constraints and meeting elevated demand, potentially enabling higher revenue generation and backlog conversion. | Ticker | 2026-03-17 | earnings_transcript | ESLT (ticker) |
| ESLT_a7a918ed | The parliamentary window expected in the second half of 2026 will determine the contractual arrangements and initial deliveries. | 2026-07-01 | 2027-03-20 | Germany is expected to finalize a major procurement framework agreement for up to 500 EuroPULS rocket artillery systems, with contractual arrangements and initial deliveries determined during a parliamentary window. | This substantial contract, potentially worth €6 billion, would establish Germany as a key EuroPULS production hub and significantly boost Elbit's revenue and market share in Europe. | Ticker | 2026-03-17 | earnings_transcript | ESLT (ticker) |
| IDR.MC_712387cb | from now until the end of the year | 2026-11-01 | 2026-12-31 | Spanish Ministry of Defense making public decisions on the 2026 Special Modernization Programs (PEMs). | These programs represent significant contract opportunities for Indra, contributing to its defense backlog and future revenue growth, with €1.4 billion allocated for at least 15 new programs in 2026. | Ticker | 2026-10-29 | earnings_transcript | IDR.MC (ticker) |
| IDR.MC_d0436678 | in the coming weeks | 2026-11-01 | 2026-12-31 | Announcement of further VCR 8x8 vehicle deliveries, exceeding the 2026 guidance of 90 units. | This demonstrates strong execution in a key defense program, reinforcing the company's industrial and production capabilities and contributing to defense revenue growth. | Ticker | 2026-10-29 | earnings_transcript | IDR.MC (ticker) |
| IDR.MC_c24bd568 | before the year-end | 2026-11-01 | 2026-12-31 | Release of the VAC program (truck support vehicle) project. | The successful release of this project demonstrates execution in a complex defense program and contributes to the company's defense business. | Ticker | 2026-10-29 | earnings_transcript | IDR.MC (ticker) |
| IDR.MC_7cc58a79 | in the coming weeks | 2026-10-16 | 2026-12-31 | News regarding the European IRIS² program. | This could provide new program opportunities and strengthen Indra's position in the space business, potentially contributing to revenue growth and long-term visibility. | Ticker | 2026-07-23 | earnings_transcript | IDR.MC (ticker) |
| ONDS_9a499cb2 | 2026 | 2026-01-01 | 2026-12-31 | Management guidance target of at least $110 million in revenue for fiscal year 2026. | Hitting or exceeding the $110M target would validate the scaling thesis, materially improve revenue visibility and investor sentiment; missing it would call into question backlog conversion, margin leverage assumptions and the credibility of M&A-driven growth forecasts. | Ticker | 2025-11-13 | earnings_transcript | ONDS (ticker) |
| ONDS_74d1f53e | completed in 2026 | 2026-01-01 | 2026-12-31 | AAR Wireless Communications Committee (WCC) completion of NGHE / HOT & EOT (next‑generation Head/End Of Train) specifications in 2026. | NGHE spec completion is a theme-level regulatory/standards milestone that would accelerate vendor product finalization and railroad procurements for DOT 16 upgrades; timely completion is bullish for Ondas Networks' addressable market and future orders, while slippage would defer meaningful railroad revenue to later years. | Theme | 2025-11-13 | earnings_transcript | ONDS (ticker) |
| ONDS_460b4631 | end of Q4 (initial unit) with further deliveries in 2026 | 2025-12-01 | 2026-12-31 | Shipment of the first Northeast Corridor access production unit (Amtrak positive train control / safety‑critical application) at end of Q4, with additional deliveries scheduled in 2026. | On-schedule deliveries and acceptance by Amtrak (Northeast Corridor) would be an important reference customer and commercial proof‑point for Ondas Networks, potentially unlocking larger vendor/railroad orders; missed shipments or acceptance issues would delay revenue recognition and undermine credibility for DOT 16 commercialization. | Ticker | 2025-11-13 | earnings_transcript | ONDS (ticker) |
| ONDS_1c1f40b7 | full year 2026 | 2026-01-01 | 2026-12-31 | Ondas Holdings Inc. raised its full-year 2026 revenue outlook to at least $390 million. | This indicates stronger-than-expected business performance and increased confidence in future revenue generation, partly driven by strategic acquisitions, which is bullish for valuation and investor sentiment. | Ticker | 2026-05-14 | earnings_transcript | ONDS (ticker) |
| ONDS_b0e7fea4 | over the course of 2026 | 2026-05-28 | 2026-12-31 | Ondas plans to introduce new systems of systems capabilities across its portfolio. | New product introductions can expand addressable markets, drive revenue growth, and enhance the company's competitive position in the unmanned and autonomous systems sector. This is bullish. | Ticker | 2026-05-14 | earnings_transcript | ONDS (ticker) |
| ONDS_c03cfd96 | over the course of 2026 | 2026-05-28 | 2026-12-31 | Ondas expects cash efficiency to improve as revenue and gross profit scale. | Improved cash efficiency indicates better financial management and operational leverage, which is bullish for the company's financial health and long-term sustainability. | Ticker | 2026-05-14 | earnings_transcript | ONDS (ticker) |
| ONDS_d5eee21a | second half of 2026 | 2026-07-01 | 2026-12-31 | Ondas expects meaningful improvement in adjusted EBITDA losses for its Ondas Autonomous Systems (OAS) segment. | This indicates the OAS segment is moving towards profitability, demonstrating operating leverage and validating the growth strategy, which is bullish for the company's financial performance. | Ticker | 2026-05-14 | earnings_transcript | ONDS (ticker) |
| ONDS_b1ba8331 | targeted for the fourth quarter of 2026 | 2026-10-01 | 2026-12-31 | Initial integrations of the Sky Weaver AI intelligence layer across the Ondas portfolio of platforms. | Successful integration of Sky Weaver will enhance mission autonomy, create a unified intelligence system, and potentially shift the business model towards higher-margin software and outcomes, which is bullish for competitive advantage and revenue per mission. | Ticker | 2026-05-14 | earnings_transcript | ONDS (ticker) |
| ONDS_cac9b9ad | during the second half of 2026 | 2026-07-01 | 2026-12-31 | Ondas expects its strategic growth program (including potential additional M&A like Omnisys) to contribute meaningfully to the revenue outlook in the second half of 2026. | Successful integration and revenue contribution from acquisitions will further accelerate growth and validate the M&A strategy, which is bullish for overall financial performance. | Ticker | 2026-05-14 | earnings_transcript | ONDS (ticker) |
| ONDS_23795734 | through 2026 and beyond | 2026-05-28 | 2027-12-31 | Ondas expects its product companies to maintain profitability, though quarterly results may fluctuate. | Sustained profitability at the product company level demonstrates the underlying strength and efficiency of the core businesses, providing a solid foundation for overall company profitability and is bullish. | Ticker | 2026-05-14 | earnings_transcript | ONDS (ticker) |
| ONDS_76a00f58 | Q2, Q3 and Q4 | 2026-04-01 | 2026-12-31 | Ondas anticipates strong sequential revenue growth in Q2, Q3, and Q4 of 2026. | Consistent sequential revenue growth demonstrates strong demand, effective execution, and successful conversion of backlog, which is highly bullish for investor confidence and valuation. | Ticker | 2026-05-14 | earnings_transcript | ONDS (ticker) |
| ONDS_cf7d1047 | over time | 2026-05-28 | 2027-12-31 | Ondas expects gross margins to trend higher towards 50% as the company scales and achieves greater efficiencies. | Improving gross margins indicate better product mix, cost management, and pricing power, which is bullish for profitability and financial health. | Ticker | 2026-05-14 | earnings_transcript | ONDS (ticker) |
| ONDS_7a9123d4 | as we're moving through the year in terms of systems of systems and integrated solutions. | 2026-05-28 | 2026-12-31 | Ondas plans to introduce additional systems of systems and integrated solutions beyond Iron Wave. | Expanding the portfolio with integrated solutions can open new market opportunities, increase customer stickiness, and drive higher revenue per deployment, which is bullish for growth and competitive positioning. | Ticker | 2026-05-14 | earnings_transcript | ONDS (ticker) |
| ONDS_cae8ff66 | how effectively Ondas integrates Omnisys and how quickly these AI tools are embedded into existing defense offerings | 2026-05-27 | 2027-05-27 | Ondas's integration of Omnisys's AI battlefield decision-making software into its autonomous defense platform. | Successful integration will shift Ondas towards a higher-margin, software-driven defense technology model, enhancing its AI capabilities and potentially changing how revenue is earned and contracts are structured. This is bullish. | Ticker | 2026-05-14 | earnings_transcript | ONDS (ticker) |
| IDR.MC_5d48f96e | by November 25 | 2026-11-25 | 2026-11-25 | Indra's Capital Market Day. | Management will unveil the strategic plan, including the vision for Minsait, IndraMind KPIs, and space business strategy, which is expected to significantly impact investor sentiment and future growth expectations. | Ticker | 2026-10-29 | earnings_transcript | IDR.MC (ticker) |
| AVAV_8ac7de72 | sometime in December or January of next calendar year (budget approval), until March. Time frame, roughly (funding to customers) | 2026-12-01 | 2027-03-31 | Approval of the US Government Fiscal Year 2027 defense budget and subsequent flow of funding to military services. | Delays in budget approval and funding flow directly impact the timing of contract awards and revenue realization for AVAV, particularly affecting the first half of fiscal year 2027. Earlier approval would be bullish. | Theme | 2026-06-29 | earnings_transcript | AVAV (ticker) |
| AVAV_5a083133 | about a year from now | 2026-12-09 | 2026-12-31 | Salt Lake City 100,000 sq. ft. factory for Switchblade production becoming operational (management: facility operational about a year from now to expand Switchblade lines and capacity). | If brought online and ramped on schedule, the factory materially increases Switchblade manufacturing capacity (management cites potential > $2B/year) and supports revenue growth and scale economics; delays or underperformance would constrain capacity, slow revenue ramp and pressure margins. | Ticker | 2025-12-09 | earnings_transcript | AVAV (ticker) |
| HAG.XETRA_321cff86 | From 2027 onwards | 2027-01-01 | 2027-03-31 | Commencement of substantial production ramp-up at Hensoldt's new production site near Ulm for air defense and drone defense radars. | This strategic capacity expansion is crucial for Hensoldt to meet increased customer demand and safeguard its delivery capability, targeting an annual output of around 1,000 radar units from 2027, especially for TRML-4D and Spexer radars. | Ticker | 2025-11-07 | earnings_transcript | HAG.XETRA (ticker) |
| SAAB-B.ST_9d8b19e6 | early 2027 | 2027-01-01 | 2027-03-31 | Sweden's first GlobalEye Airborne Early Warning & Control (AEW&C) system becomes operational. | The operational deployment of the first Swedish GlobalEye demonstrates successful delivery and integration of a key product, potentially boosting confidence for other GlobalEye customers like Canada and NATO. | Ticker | 2026-10-23 | earnings_transcript | SAAB-B.ST (ticker) |
| SAAB-B.ST_05f8d5d4 | early next year | 2027-01-01 | 2027-03-31 | Inauguration of the new Dynamics manufacturing facility in India. | This facility, expected early next year, will further enhance Saab's global production capacity for Dynamics products, supporting long-term growth and meeting increasing international demand. | Ticker | 2026-07-17 | earnings_transcript | SAAB-B.ST (ticker) |
| SAAB-B.ST_e170dd82 | coming into play next year (2027) | 2027-01-01 | 2027-12-31 | Saab's new Carl-Gustaf manufacturing facility in India commencing significant production and contributing to results. | Expands production capacity to meet strong market demand for Dynamics' portfolio, supporting future revenue growth and strengthening Saab's 'Make in India' commitment. | Ticker | 2026-02-05 | earnings_transcript | SAAB-B.ST (ticker) |
| AVAV_2c3b2884 | beginning of next calendar year / spring of calendar year 27 | 2027-01-01 | 2027-05-31 | Start of Switchblade production at AeroVironment's Salt Lake City manufacturing facility. | This facility has the potential to produce over $2 billion worth of Switchblades or other AV products annually, significantly increasing manufacturing capacity to meet anticipated rising demand and drive revenue growth. | Ticker | 2026-06-29 | earnings_transcript | AVAV (ticker) |
| RTX_acb5328b | early next year | 2027-01-01 | 2027-03-31 | Pratt & Whitney to begin incorporating the Hot Section Plus (HSP) upgrade package into GTF engine MRO visits. | This upgrade is designed to significantly improve the time on-wing performance and durability of the installed GTF fleet, enhancing customer satisfaction and supporting long-term aftermarket growth and margin expansion. | Ticker | 2026-10-20 | earnings_transcript | RTX (ticker) |
| ONDS_7d48494d | first quarter of 2027, 6 months ahead of our prior target | 2027-01-01 | 2027-03-31 | Ondas Autonomous Systems (OAS) is expected to achieve EBITDA profitability in Q1 2027, six months ahead of its prior target, partly due to the Omnisys acquisition. | Achieving EBITDA profitability for the core OAS segment ahead of schedule is a significant milestone, indicating strong operational leverage and a clear path to overall company profitability, which is highly bullish for investor sentiment and valuation. | Ticker | 2026-05-14 | earnings_transcript | ONDS (ticker) |
| AVAV_f6712da7 | late fiscal year 2027 or early fiscal year 2028 | 2027-02-01 | 2027-07-31 | Commencement of flight testing for the Freedom Eagle-1 (FE-1) Long-Range Kinetic Interceptor program. | Successful flight testing is a critical milestone for the FE-1 program, de-risking future development and potentially leading to further production contracts. | Ticker | 2026-03-10 | earnings_transcript | AVAV (ticker) |
| AVAV_65b07dd9 | about a year from now | 2027-03-10 | 2027-03-10 | New 140,000 square foot manufacturing facility in Salt Lake City, Utah, becoming operational. | This facility will significantly increase production capacity for Switchblades and other AVAV products, enabling the company to meet anticipated high demand and capitalize on growth opportunities. | Ticker | 2026-03-10 | earnings_transcript | AVAV (ticker) |
| AVAV_ae03fbe4 | about a year or so time frame for commercial product development, significant revenue contribution more of a contributor in fiscal year '28 than '27 | 2027-03-10 | 2028-04-30 | Resolution of the SCAR program (BADGER phased array antenna system) either through recompete or successful commercialization as a product. | The resolution will impact the Space, Cyber and Directed Energy segment's long-term growth and profitability. Successful commercialization could lead to higher margins and broader market adoption. | Ticker | 2026-03-10 | earnings_transcript | AVAV (ticker) |
| EOS.AU_43d5b9db | towards the middle of 2027 | 2027-04-01 | 2027-06-30 | Delivery of the first 100-kilowatt high-energy laser weapon system to the Dutch client. | This delivery, approximately one year ahead of schedule, demonstrates EOS's capability to execute on complex contracts and could lead to increased scope or further orders. | Ticker | 2026-08-24 | earnings_transcript | EOS.AU (ticker) |
| AVAV_2e20e061 | approximately 12 months | 2027-06-29 | 2027-06-29 | Freedom Eagle-1 (FE-1) program moving toward flight test. | Successful flight tests are critical for the FE-1 program, which represents a close to $1 billion market opportunity for AV over the next several years, with Congress increasing funding to accelerate production. | Ticker | 2026-06-29 | earnings_transcript | AVAV (ticker) |
| AVAV_556d6265 | about 12 months away from now | 2027-09-10 | 2027-09-10 | AeroVironment expects to transition the Freedom Eagle-1 Long-Range Kinetic Interceptor (LRKI) missile program to full rate production. | This milestone marks the ramp-up of a critical counter-UAS solution, positioning it as a potential $1 billion franchise for the company long-term. | Ticker | 2026-09-09 | earnings_transcript | AVAV (ticker) |
| SAAB-B.ST_a1bffaf2 | a couple of years more (from Feb 2026), looking at '28, '29 actually. | 2028-01-01 | 2029-12-31 | Saab's portion of the T-7 Red Hawk trainer program reaching profitability, driven by increased deliveries and potential contract renegotiations. | Improved profitability in the Aeronautics segment by reducing under-absorption in the West Lafayette facility and potentially securing additional contract value. | Ticker | 2026-02-05 | earnings_transcript | SAAB-B.ST (ticker) |