| Ongoing adjustments and temporary reductions in Section 232 tariffs on steel, aluminum, and copper imports, with current measures extending through December 2027. These dynamic policy changes continue to influence material costs and supply chain stability. | Ongoing through December 2027 | 2026-10-20 | 2027-12-31 | These tariff modifications directly impact the input costs and profitability for numerous theme companies that rely on these materials. While some changes offer relief, the potential expiration of temporary reductions creates ongoing supply chain and margin management considerations, affecting project costs and pricing strategies. | Theme | theme_composer | GEV, HPS-A.TO, SU.PA, NXT, ETN, VRT, ABBN.SW, HUBB, PRY.MI, PWR, MTZ, FPS, NVT | 13 | 0.0308 | 1.18 | 0.85 | Regulatory/Policy, Conference/Council | 1.62 | 4.9984 | 2026-10-21 | False | 1 | 2.6211 | 425.8926 | theme_composer | Theme composer | | |
| Continued implementation of FERC Order 2023 reforms by Regional Transmission Organizations (RTOs) and Independent System Operators (ISOs), with specific milestones like CAISO Cluster 16 opening and ongoing responses to FERC's orders on large-load interconnection tariffs. | Ongoing through Q4 2026 | 2026-10-01 | 2026-12-31 | These regulatory actions are crucial for streamlining interconnection processes, unlocking project pipelines for renewable energy and data centers, and accelerating construction timelines. Progress will reduce significant bottlenecks and provide greater certainty for new generation and load interconnections, directly benefiting grid infrastructure developers and equipment suppliers. | Theme | theme_composer | PWR, MTZ, NXT, GEV, ANA.MC, PRIM, VRT, ETN, HUBB, SU.PA, ABBN.SW | 11 | 0.0273 | 1.18 | 1.0 | Regulatory/Policy | 1.35 | 4.3566 | 2026-10-21 | False | 1 | 2.2097 | 352.0009 | theme_composer | Theme composer | | |
| Ongoing deployment of advanced 800V DC power architectures and liquid cooling solutions for AI data centers, with key product launches and initial deployments continuing. This includes Vertiv's full-stack 800V DC power supply system and nVent's expanded liquid cooling capacity. | Ongoing through H1 2027 | 2026-10-20 | 2027-06-30 | The rapid adoption of efficient 800V DC architectures and advanced liquid cooling is critical for managing the high power density of AI workloads, expanding addressable markets, and enhancing efficiency across the grid-to-chip ecosystem. This provides substantial revenue visibility and growth for equipment providers and contractors. | Theme | theme_composer | VRT, PWR, ABBN.SW, ETN, SU.PA, GEV, MTZ, HPS-A.TO, PRIM, HUBB, NXT, FPS, NVT, SIE.XETRA | 14 | 0.0298 | 1.18 | 0.92 | | 1.0 | 3.2385 | 2026-10-21 | False | 1 | 2.8639 | 310.9042 | theme_composer | Theme composer | | |
| Expansion of domestic manufacturing capacity for critical grid components, including power transformers (PWR, HPS-A.TO), electrical switchgear (ETN), and liquid cooling solutions (NVT), driven by record backlogs and government incentives. | Ongoing through 2027 | 2026-10-20 | 2027-12-31 | Increased domestic manufacturing capacity addresses supply chain vulnerabilities, reduces lead times, and supports the massive build-out of grid modernization and AI data center infrastructure. This ensures more reliable project execution and can alleviate some inflationary pressures, benefiting companies with significant U.S. operations and backlogs. | Theme | theme_composer | PWR, HPS-A.TO, ETN, NVT, GEV, HUBB, FPS | 7 | 0.0147 | 1.18 | 0.85 | Economic | 1.25 | 1.8442 | 2026-10-21 | False | 1 | 1.3191 | 165.3853 | theme_composer | Theme composer | | |
| The gradual adoption and design of new 800-volt DC architecture for AI data centers, where ABB aims to be a key technology partner. | stepwise approach over several years | 2026-07-01 | 2029-12-31 | Successful partnership and increased content in these next-generation data centers could significantly increase ABB's revenue per megawatt and strengthen its competitive position in the rapidly growing AI data center market. | Theme | | | | | | | | | | | | | | | earnings_transcript | ABBN.SW (ticker) | ABBN.SW_91f8558b | 2025-10-16 |
| Completion of the sale of ABB's Robotics division to SoftBank Group. | second half of 2026 | 2026-07-01 | 2026-12-31 | This will finalize the strategic divestment, eliminate stranded costs, and provide approximately $5.4 billion in cash for capital allocation (M&A, organic investment, dividends, share buybacks). It will also impact group margin positively as Robotics runs below average. | Ticker | | | | | | | | | | | | | | | earnings_transcript | ABBN.SW (ticker) | ABBN.SW_87595e1a | 2025-10-16 |
| ABB's execution of its M&A strategy and allocation of proceeds from the Robotics sale, including potential organic investments, acquisitions, dividends, and share buybacks. | over time | 2026-07-01 | 2028-12-31 | These capital allocation decisions will directly impact ABB's future growth trajectory, financial structure, and shareholder returns, influencing valuation and investor sentiment. | Ticker | | | | | | | | | | | | | | | earnings_transcript | ABBN.SW (ticker) | ABBN.SW_a2f74288 | 2025-10-16 |
| Award of the I-24 managed lane project in Tennessee and the I-285 managed lane project in Georgia. | within 2026 or resolution of the participation in 2026 | 2026-07-24 | 2026-12-31 | Securing these significant managed lane projects in the U.S. will validate Acciona's integrated construction plus concession model and contribute substantially to its long-term infrastructure backlog and future growth. Bullish. | Ticker | | | | | | | | | | | | | | | earnings_transcript | ANA.MC (ticker) | ANA.MC_a126ab87 | 2026-02-27 |
| Electrical Americas segment operating margin improvement of 200-250 basis points from Q3 to Q4 2026, contributing to a strong exit rate for the year. | sequential from Q3 to Q4 | 2026-10-01 | 2026-12-31 | Continued sequential margin improvement demonstrates successful operational execution, increased productivity from new facilities, and effective price/cost management, crucial for achieving the company's long-term margin targets. | Ticker | | | | | | | | | | | | | | | earnings_transcript | ETN (ticker) | ETN_e8dc5075 | 2026-07-31 |
| Achieving at least 125 gigawatts under contract for Gas Power. | by the end of the year | 2026-10-01 | 2026-12-31 | This is a key metric for Gas Power demand and future revenue, demonstrating continued strong order intake and market leadership. | Ticker | | | | | | | | | | | | | | | earnings_transcript | GEV (ticker) | GEV_6d893978 | 2026-07-22 |
| Hyperscaler testing of GE Vernova's first Solid-State Transformer (SST) product. | deliver the first product to a hyperscaler in the fall of this year, after which they will have six months of testing of that product before it can play into a potential order really in 2027. | 2026-09-01 | 2027-05-31 | Successful testing is a prerequisite for potential orders in 2027, which would expand GE Vernova's scope within data centers and drive future Electrification segment growth. | Ticker | | | | | | | | | | | | | | | earnings_transcript | GEV (ticker) | GEV_cb823321 | 2026-04-22 |
| Shipment of large data center orders received shortly after Q3 2025 close, representing 53% of the total Q3 closing backlog, primarily from new Mexico facilities. | over the next 12 to 18 months | 2026-10-24 | 2027-04-24 | These shipments are expected to drive significant revenue growth and demonstrate the effective utilization of expanded capacity, positively impacting financial results and investor confidence. | Ticker | | | | | | | | | | | | | | | earnings_transcript | HPS-A.TO (ticker) | HPS-A.TO_788e40cd | 2025-10-24 |
| Alleviation of unabsorbed overheads in new Mexico factories due to increased backlog and pricing actions offsetting negative inflationary impacts on material inputs. | in 2026 | 2026-01-01 | 2026-12-31 | This is expected to improve gross margins and overall profitability in 2026 by optimizing factory utilization and mitigating cost pressures, which could positively impact investor sentiment. | Ticker | | | | | | | | | | | | | | | earnings_transcript | HPS-A.TO (ticker) | HPS-A.TO_99dfdaba | 2025-10-24 |
| Hammond Power Solutions reaching a total manufacturing capacity of approximately $1.2 billion across its facilities. | by 2027 | 2026-07-09 | 2027-12-31 | This capacity expansion is critical for meeting the increasing demand for data center and other large projects, supporting long-term revenue growth and market position. | Ticker | | | | | | | | | | | | | | | earnings_transcript | HPS-A.TO (ticker) | HPS-A.TO_00916df3 | 2025-10-24 |
| Realization of approximately $20 million net benefit in Q4 2026, largely as a result of IEPA refunds. | fourth quarter | 2026-10-01 | 2026-12-31 | This directly impacts profitability and adjusted operating margins, particularly in Q4, and contributes to the raised full-year guidance. | Ticker | | | | | | | | | | | | | | | earnings_transcript | HUBB (ticker) | HUBB_0dab3670 | 2026-07-28 |
| Achievement of Itron's revised upwards full-year 2026 non-GAAP earnings per share guidance of $6.30 to $6.50. | full year non-GAAP earnings per share... $6.30 to $6.50 per share | 2026-10-01 | 2026-12-31 | This target reflects improved profitability expectations driven by structural changes and operational execution, making its achievement a bullish indicator for the company's enhanced earnings power. | Ticker | | | | | | | | | | | | | | | earnings_transcript | ITRI (ticker) | ITRI_ffe3bea8 | 2026-07-28 |
| Update on the progression of Superior Group's backlog. | when we report our third quarter numbers | 2026-10-20 | 2026-11-15 | This update will provide further clarity on the acquired company's contribution to MasTec's overall backlog and future revenue, influencing investor sentiment regarding the acquisition's impact. | Ticker | | | | | | | | | | | | | | | earnings_transcript | MTZ (ticker) | MTZ_193bfca3 | 2026-07-30 |
| Realization of significant revenue synergies from the Superior Group acquisition, translating into more business across MasTec's operations. | before year-end | 2026-08-07 | 2026-12-31 | This catalyst is crucial as it validates the strategic benefits of MasTec's largest acquisition, potentially leading to increased revenue, expanded market share, and enhanced competitive positioning. | Ticker | | | | | | | | | | | | | | | earnings_transcript | MTZ (ticker) | MTZ_5728d120 | 2026-07-30 |
| Acquisition of McKee Utility Contractors to expand water infrastructure capabilities. | During 2026 | 2026-01-01 | 2026-12-31 | Adds water infrastructure capacity and potential backlog/margin accretion; strengthens CE&I/Infrastructure execution platform. | Ticker | | | | | | | | | | | | | | | earnings_transcript | MTZ (ticker) | MTZ_0153a0f0 | 2026-02-27 |
| Guidance assumes acquisitions contribute approximately $500 million of revenue for 2026 at high-single-digit EBITDA margins. | 2026 | 2026-01-01 | 2026-12-31 | Key driver of 2026 top-line growth and mix; realization affects investor sentiment and margin trajectory. | Ticker | | | | | | | | | | | | | | | earnings_transcript | MTZ (ticker) | MTZ_e419aecd | 2026-02-27 |
| Turnkey data center construction project related to NV2A, with approximately $1 billion of data center work; expects to conclude in 2027 and expands self-perform capabilities. | Between 2026 and 2027 | 2026-01-01 | 2027-12-31 | Potential margin upside from self-perform work and an expanding data-center-related services mix; could boost CE&I backlog and revenue in 2026–2027. | Ticker | | | | | | | | | | | | | | | earnings_transcript | MTZ (ticker) | MTZ_8e8f2698 | 2026-02-27 |
| Launch of nVent's new modular liquid cooling platform. | later this fall | 2026-09-01 | 2026-11-30 | This new product offering is expected to drive significant growth and appeal to a broad set of customers, supporting the accelerating AI data center build-out. | Ticker | | | | | | | | | | | | | | | earnings_transcript | NVT (ticker) | NVT_87a433d7 | 2026-07-31 |
| Investment in and completion of a new Premier PV (eBOS) manufacturing facility, expected to come online in Q4 2026. | in 2026 | 2026-01-01 | 2026-12-31 | This facility expansion will increase manufacturing capacity and product offerings for the eBOS business, enabling significant growth starting in 2027 and supporting the overall renewables segment's performance. | Ticker | | | | | | | | | | | | | | | earnings_transcript | PRIM (ticker) | PRIM_163f2738 | 2026-02-23 |
| Securing additional large-diameter pipeline project bookings. | in 2026 | 2026-02-25 | 2026-12-31 | Successful pipeline bookings are crucial for Primoris to meet its 2026 guidance, as these projects are quick book-and-burn and current backlog is insufficient. Positive outcomes would be bullish for revenue and investor confidence. | Ticker | | | | | | | | | | | | | | | earnings_transcript | PRIM (ticker) | PRIM_661e1b35 | 2026-02-23 |
| Announcement of strategic acquisitions to expand capabilities in subscale markets or accelerate growth. | going forward | 2026-02-25 | 2028-02-25 | Accretive acquisitions could expand Primoris's market share, enhance its service offerings, and drive higher-margin growth, potentially leading to a positive impact on valuation. | Ticker | | | | | | | | | | | | | | | earnings_transcript | PRIM (ticker) | PRIM_a57a53e3 | 2026-02-23 |
| Occurrence and magnitude of storm response work. | 2026 | 2026-01-01 | 2026-12-31 | Storm work is highly accretive to power delivery margins and could provide upside to Primoris's adjusted EBITDA guidance for 2026, as it is currently excluded from the company's outlook. | Ticker | | | | | | | | | | | | | | | earnings_transcript | PRIM (ticker) | PRIM_304f350b | 2026-02-23 |
| Digital Solutions EBITDA margin reaching slightly higher than 25% as a run rate in Q4 2026. | end up slightly higher than 25% in quarter 4 | 2026-10-01 | 2026-12-31 | This indicates significant profitability improvement in the Digital Solutions segment, driven by repricing and the shift to data center business, which is a key growth area for the company. | Ticker | | | | | | | | | | | | | | | earnings_transcript | PRY.MI (ticker) | PRY.MI_3d224b66 | 2026-07-30 |
| Quanta provided its full-year 2026 financial expectations, including continued double-digit growth in revenues, net income and adjusted EBITDA, with the opportunity to deliver over 20% growth in adjusted EPS and a year-end backlog around $44 billion plus free cash flow guidance (midpoint about $1.8 billion). | full year 2026 financial expectations | 2026-01-01 | 2026-12-31 | Sets the growth and profitability trajectory for 2026; achievement would support the stock's valuation via stronger backlog conversion and cash generation. | Ticker | | | | | | | | | | | | | | | earnings_transcript | PWR (ticker) | PWR_ac14b71e | 2026-02-19 |
| Plan to invest roughly $500 million to $700 million over the next several years to advance vertical supply chain capabilities, including power transformer manufacturing facilities. | over the next several years | 2026-02-19 | 2028-02-19 | Expands self-supply capacity, potentially improving project execution, reducing lead times, and supporting higher-margin, integrated 'Total Solutions' deployments. | Ticker | | | | | | | | | | | | | | | earnings_transcript | PWR (ticker) | PWR_58ffd560 | 2026-02-19 |
| Regional Transmission Organizations (RTOs) to respond to FERC's June 18, 2026 orders to justify or reform their large-load interconnection tariffs, particularly for data centers, and continue implementing FERC Order 2023 reforms. | August 2026 - December 2026 | 2026-08-01 | 2026-12-31 | These actions are critical for unlocking project pipelines, accelerating construction timelines, and improving profitability for developers and contractors involved in grid expansion and renewable integration, especially given the surging demand from AI data centers. | Theme | | | | | | | | | | | | | | | earnings_transcript | SIE.XETRA (ticker) | SIE.XETRA_a4ba525c | 2026-08-06 |
| Regional Transmission Organizations (RTOs) are responding to FERC's June 18, 2026 orders to justify or reform their large-load interconnection tariffs, particularly for data centers, with responses due by August 17, 2026. | August 2026 - December 2026 | 2026-08-01 | 2026-12-31 | These actions are critical for unlocking project pipelines, accelerating construction timelines, and improving profitability for developers and contractors involved in grid expansion and renewable integration, especially given the surging demand from AI data centers. | Theme | | | | | | | | | | | | | | | earnings_transcript | SU.PA (ticker) | SU.PA_3e6b038c | 2026-07-30 |
| Schneider Electric's ability to achieve its full-year 2026 financial guidance, including 7-10% organic revenue growth, 10-15% adjusted EBITA growth, and 50-80 bps adjusted EBITDA margin expansion. | Full Year 2026 | 2026-01-01 | 2026-12-31 | Meeting or exceeding this guidance would positively impact investor sentiment and valuation, demonstrating successful execution of their strategy. Missing it could lead to negative sentiment and a re-evaluation of the company's growth trajectory and operational efficiency. | Ticker | | | | | | | | | | | | | | | earnings_transcript | SU.PA (ticker) | SU.PA_f1089b08 | 2026-02-26 |
| Continued improvement in Industrial Automation's adjusted EBITDA margin in 2026, driven by better business mix (Discrete vs. Process & Hybrid), normal productivity, and the near completion of the AVEVA subscription transition. | Throughout 2026 | 2026-01-01 | 2026-12-31 | This segment's margin improvement is crucial for overall profitability and demonstrates the effectiveness of strategic changes under new leadership. Achieving the targeted margin journey towards 18% by 2028 would be a significant positive. | Ticker | | | | | | | | | | | | | | | earnings_transcript | SU.PA (ticker) | SU.PA_f74add8f | 2026-02-26 |
| Gross margin progression turning positive in the second half of 2026, driven by continued price increases offsetting raw material impacts and tariffs. | Second half of 2026 | 2026-07-01 | 2026-12-31 | A positive gross margin evolution would signal successful pricing power and cost management, positively impacting profitability and investor confidence. Flat to negative progression in H1 2026 could be a short-term headwind, making the H2 turnaround critical. | Ticker | | | | | | | | | | | | | | | earnings_transcript | SU.PA (ticker) | SU.PA_09553309 | 2026-02-26 |
| Launch of Vertiv's 800-volt architecture product portfolio. | second half this year launches of portfolio | 2026-07-01 | 2026-12-31 | The successful introduction of 800-volt products is crucial for Vertiv to maintain its leadership and capture market share in the rapidly evolving high-density AI data center segment, expanding its addressable market. | Ticker | | | | | | | | | | | | | | | earnings_transcript | VRT (ticker) | VRT_eaa28596 | 2026-04-22 |
| Successful mitigation of tariff exposures, including recent changes under Section 122 and 232. | continue to materially offset those | 2026-04-01 | 2026-12-31 | Effective tariff countermeasures are essential for protecting Vertiv's adjusted operating margins and achieving its profitability guidance amidst evolving trade dynamics. | Ticker | | | | | | | | | | | | | | | earnings_transcript | VRT (ticker) | VRT_c7ea5f9b | 2026-04-22 |
| EMEA returning to year-over-year sales growth. | second half | 2026-07-01 | 2026-12-31 | A recovery in EMEA sales would validate management's confidence in the region's demand trajectory, contributing to overall revenue growth and mitigating concerns about regional weakness. | Ticker | | | | | | | | | | | | | | | earnings_transcript | VRT (ticker) | VRT_b01bf2f8 | 2026-04-22 |
| Nextpower's second Capital Markets Day to update 2030 outlook. | November 16th | 2026-11-16 | 2026-11-16 | Management will provide an updated 2030 outlook reflecting material acceleration due to strong market momentum, recent strategic acquisitions, and exemplary operational execution, which could significantly influence investor sentiment and future growth expectations. | Ticker | | | | | | | | | | | | | | | earnings_transcript | NXT (ticker) | NXT_bdae8436 | 2026-07-30 |
| Centrus Energy's first Investor Day at the American Centrifuge plant in Piketon, Ohio. | December | 2026-12-01 | 2026-12-31 | This event provides a crucial opportunity for management to share detailed strategy, growth opportunities, and the long-term outlook, potentially boosting investor confidence and market visibility. It allows for direct engagement with stakeholders. | Ticker | | | | | | | | | | | | | | | earnings_transcript | LEU (ticker) | LEU_b8202636 | 2026-08-04 |
| Eaton's Mobility Group (Vehicle and eMobility) spin-off, aiming to streamline Eaton's portfolio and allow greater focus on its core Electrical segments which are benefiting from the grid modernization and AI data center supercycle. | Q1 2027 | 2027-01-01 | 2027-03-31 | This spin-off is expected to unlock value for Eaton by creating a more focused 'pure-play' on electrification and power management, directly aligning with the core drivers of the Grid Modernization & Infra theme. It could lead to increased investor interest and a re-rating of the remaining Electrical segments. | Ticker | theme_composer | ETN | 1 | 0.0024 | 1.18 | 1.0 | | 1.0 | 0.2866 | 2026-10-21 | False | 1 | 0.0275 | 3.2418 | theme_composer | Theme composer | | |
| Potential orders for Solid-State Transformers (SST) following hyperscaler testing. | really in 2027 | 2027-01-01 | 2027-12-31 | Would represent a significant new product win inside the data center, further increasing GEV's 'entitlement per gigawatt' and revenue. | Ticker | | | | | | | | | | | | | | | earnings_transcript | GEV (ticker) | GEV_1b202ed8 | 2026-04-22 |
| Completion of the full integration of the Urbint and Locusview acquisitions, forming the Resiliency Solutions segment. | fully integrated by early January | 2027-01-01 | 2027-01-31 | Successful integration is vital for realizing the full revenue and EPS accretion targets for 2027 from these high-margin software businesses, enhancing long-term profitability and revenue durability. | Ticker | | | | | | | | | | | | | | | earnings_transcript | ITRI (ticker) | ITRI_0224fe76 | 2026-07-28 |
| Pipeline Infrastructure revenue potentially reaching historical highs (around $3.5 billion) by 2027. | As early as 2027 | 2027-01-01 | 2027-12-31 | Significant upside potential for MasTec's growth and backlog; could drive meaningful top-line and margin benefits as the segment scales. | Ticker | | | | | | | | | | | | | | | earnings_transcript | MTZ (ticker) | MTZ_161d0c62 | 2026-02-27 |
| BEAD-driven fiber deployment and data-center connectivity growth; management expects BEAD impact to be meaningful in 2027. | Predominantly 2027, with some 2026 activity | 2027-01-01 | 2027-12-31 | Macro tailwind for Communications and BEAD programs could drive backlog growth and earnings, with potential margin expansion if execution remains strong. | Theme | | | | | | | | | | | | | | | earnings_transcript | MTZ (ticker) | MTZ_d6a401d7 | 2026-02-27 |
| Opening of the third liquid cooling facility expansion in Minnesota, named Blaine 2. | expected to open in the first half of 27 | 2027-01-01 | 2027-06-30 | This capacity expansion is crucial to meet strong orders and backlog for liquid cooling demand, providing visibility through 2027 and into 2028. | Ticker | | | | | | | | | | | | | | | earnings_transcript | NVT (ticker) | NVT_c8230573 | 2026-07-31 |
| Deliveries of U.S. manufactured Apex inverters begin. | early 2027 | 2027-01-01 | 2027-03-31 | This marks the commercialization of Nextpower's new, higher-margin inverter business, addressing critical customer needs for domestic content and cybersecurity, and is a key step in diversifying revenue streams and strengthening the platform. | Ticker | | | | | | | | | | | | | | | earnings_transcript | NXT (ticker) | NXT_b590b976 | 2026-07-30 |
| New medium voltage capacity coming online in the U.S. and Europe. | expected online in January 2027 | 2027-01-01 | 2027-01-31 | This capacity expansion will address strong demand in the Power Grid and Industrial & Construction markets, particularly for data center expansion and utility upgrades, supporting revenue and margin growth. | Ticker | | | | | | | | | | | | | | | earnings_transcript | PRY.MI (ticker) | PRY.MI_b63c40b5 | 2026-07-30 |
| New Capital Market Day to disclose the company's trajectory and organic growth drivers from 2027 through 2030/2031. | in the start '27 / next quarter 1, quarter 2, '27 | 2027-01-01 | 2027-06-30 | This event will provide updated long-term targets and strategic insights, potentially impacting investor sentiment and valuation by outlining future growth opportunities. | Ticker | | | | | | | | | | | | | | | earnings_transcript | PRY.MI (ticker) | PRY.MI_4780cf31 | 2026-07-30 |
| Gas-fired generation backlog ramp with multiple projects expected to enter backlog in 2027–2029 as the company expands its 'Total Solutions' platform into generation. | 27, 28, 29 type build | 2027-01-01 | 2029-12-31 | Could meaningfully boost revenue and earnings in the late 2020s; execution risk and capital intensity could affect margins and investor sentiment. | Ticker | | | | | | | | | | | | | | | earnings_transcript | PWR (ticker) | PWR_681f5f90 | 2026-02-19 |
| Hubbell Investor Day to share details on long-term strategy and outlook. | March 4, 2027 | 2027-03-04 | 2027-03-04 | This event provides a platform for management to articulate future growth drivers, capital allocation, and strategic priorities, potentially impacting investor sentiment and valuation. | Ticker | | | | | | | | | | | | | | | earnings_transcript | HUBB (ticker) | HUBB_9a87d382 | 2026-07-28 |
| The new 385,000 square foot Powertrain Solutions facility in Tijuana is expected to come online. | fourth quarter of fiscal '27 | 2027-06-01 | 2027-08-31 | This significant capacity expansion will increase Powertrain Solutions manufacturing capacity by over 50% and total revenue capacity, enabling Forgent Power Solutions to capture more demand and drive revenue growth. | Ticker | | | | | | | | | | | | | | | earnings_transcript | FPS (ticker) | FPS_a01eba5f | 2026-09-15 |